General Motors has teamed up with Pilot Company and EVgo to build and operate a network of high-speed chargers spanning the U.S. The initial phase will see the installation of 2,000 charging bays spread across 500 Pilot and Flying J roadside stops. The map below shows the locations expected to be operational during the course of 2023. By locating…
GM takes on Electrify America with 350-kw fast chargers at 500 Pilot Flying J sites



